This is the webpage for Kim Kirkendall, General Contractor. I work as a general contractor in the Seattle Area and specialize in, and am most passionate about remodelling kitchens and bathrooms. I've just posted a recent sample of my work below. Enjoy! To contact me directly email me at kimarkk@juno.com, or call me at 425.776.2472.
Sunday
"Widows Walk" Turret Pannelled Ceiling
The pictures that follow are of the pointed ceiling underneath the cylindrical "tower" in this house in Snohomish County, WA. Click on the pictures to view larger versons of the images.
Ceiling as it was.
Ceiling as it was.
Finished! Stained the wood to give it a classic, aged finish.
Thursday
Sunday
My Own Kitchen Remodel
Friday
Capitol Hill Loft Condo Bathroom Remodel (May 2007)
Recently I completed a full tear-out and rebuild of a bathroom in a Capitol Hill loft condominium. The owners picked out the gorgeous recycled-glass 1 X 1 mosaic tile, and originally wanted it to cover the entire bathroom -- floor to ceiling. I suggested that it would be easier on them, as far as maintenance goes, to have a pergo floor that matches the hardwoods they have throughout the rest of the condo.
They agreed, and I got to work. They previous set-up in the bathroom included a small closet, which I demolished to give the room a few extra feet of space. There was also a stacked washer/dryer in an alcove next to the bathtub. I had switched the direction of that plumbing so that we could put the w/d in a closet in the hallway outside the bathroom, leaving the alcove as storage space for shelves. Because of the tight condo space, we put in a pocket door so that the door wouldn't block part of the bathroom when it swings open or shut.
The owners picked out a deep tub and glass sliding shower doors, all new fixtures, and a new sink and toilet. I installed a new, more functional and quieter fan for ventilation since the bathroom is on the basement level. I also moved the heater from above the toilet to below the sink, so that it could be more effective in the colder months.
The entire project, from tear-out to completion took just about six weeks, due to a few set-backs with the plumber and waiting for supplies to be ordered and arrive.
Before:


After Tearout:


See the next post for the finished product...
They agreed, and I got to work. They previous set-up in the bathroom included a small closet, which I demolished to give the room a few extra feet of space. There was also a stacked washer/dryer in an alcove next to the bathtub. I had switched the direction of that plumbing so that we could put the w/d in a closet in the hallway outside the bathroom, leaving the alcove as storage space for shelves. Because of the tight condo space, we put in a pocket door so that the door wouldn't block part of the bathroom when it swings open or shut.
The owners picked out a deep tub and glass sliding shower doors, all new fixtures, and a new sink and toilet. I installed a new, more functional and quieter fan for ventilation since the bathroom is on the basement level. I also moved the heater from above the toilet to below the sink, so that it could be more effective in the colder months.
The entire project, from tear-out to completion took just about six weeks, due to a few set-backs with the plumber and waiting for supplies to be ordered and arrive.